Filter-Cake Removal System for Stand-Alone Screen Completions
1 Scope and Applicability
This system covers removal of the filter cake deposited during drilling so that flow paths into the reservoir are restored at the completion stage. Completions fall into two categories: cased-hole, and stand-alone screen or openhole gravel pack (OHGP). This document addresses only the filter-cake removal design for screen completions, together with the core chemical package it requires.
2 Removal Sequence for Screen Completions
2.1 Preflush (CEM-FLUSH) prior to screen running
A non-aqueous-fluid-compatible preflush (surfactant plus mutual solvent) strips the oil film, water-wets the oil-wetted solids and circulates out drilled solids and loose cake. The preflush is spotted in stages across the openhole and flowed back at a controlled, staged rate. A single high-rate flowback is not permitted: across a long openhole it would carry the dispersed solids into the production path and cause secondary plugging.
2.2 Screen running
The screen slot aperture is matched to the formation sand and to the grading of produced solids, as specified in Section 3.3.
2.3 Breaker spotted after the screens are set
A delayed breaker or cleanup fluid, compatible with the screens and the gravel, removes the residual cake. Flowback then carries the insoluble solids out of the wellbore. Formulation and placement are given in Section 4.
2.4 Gravel pack
The pack acts as a buffer: it disperses solids and limits bridging directly on the screen.
Division of duty: the preflush removes loose cake and detachable solids only. Structural filter cake is the breaker's responsibility. The two duties are not interchangeable.
3 Flush Design and Screen Sizing
3.1 Preflush: chemical tasks
Table 1 Preflush: chemical tasks and design parameters
|
Item |
Requirement |
|
Chemical task |
De-oiling, water-wetting, solids carry-over |
|
Targets |
Oil film on the wall, oil-wetted solids, loose filter cake, drilled solids |
|
Primary additive |
Multifunctional surfactant system (package below) |
|
Mutual solvent |
Mandatory. Without it the flush cannot reach beneath the oil film |
|
Key QA checks |
Contact angle ≤ 75° (interfacial tension); turbidity of returns by turbidimeter (NTU); particle concentration in the 30–40 μm band must be low |
|
Placement |
Before the screens are run |
Core additives: water-wetting agent + emulsifying solubilizer + mutual solvent + chelant (prevents surfactant salting-out and Fe(OH)₃ re-precipitation) + clay stabilizer (limits hydration and dispersion in the openhole) + corrosion inhibitor (protects the tubulars).
Function. Provides thorough and uniform destruction of OBM and SBM filter cake. Used with the D-OBR organic-acid precursor breaker, it also treats cake from reversible-invert-emulsion and invert-emulsion reservoir drill-in fluids.
Limits and applications. Bottomhole temperature below 250 °F [121 °C]. Water-wetting of non-aqueous cake is achieved by stripping the oil or synthetic phase from the particle components. Applicable to openhole completions: barefoot, stand-alone screens, expandable screens and openhole gravel pack.
3.2 Screen slot sizing
Slot aperture is matched to the formation sand grain size and to the grading of produced solids so that an over-fine slot does not bridge on silt. Design basis: slot ≤ 0.75 × smallest gravel diameter; filtration rating 1/2 to 2/3 of the smallest sand grain.
4 Breaker Design
4.1 Why oil-based cake plugs screens
Oil-based cake is a fine, oil-wetted, cohesive and dense solid. Running the screens scrapes cake off the wall; it enters the narrow annulus, cannot disperse, cannot be circulated out, and bridges directly on the slot. In horizontal wells, an eccentric cuttings bed and the drawdown after start-up compact this outer layer further. Screen completions therefore plug more readily than water-based-fluid completions and cased-perforated completions.
4.2 Chemical tasks and process parameters
Table 2 Breaker: chemical tasks and design parameters
|
Item |
Requirement |
|
Chemical task |
Dissolve mineral solids of the residual cake; carry insoluble solids out |
|
Targets |
Emulsion interface film, oil film, oil-wetted barite, CaCO₃, polymers, lost-circulation material, drilled solids |
|
Primary additive |
Acid, chelant or oxidizer with a controlled-release carrier |
|
Retardation control |
Too slow: incomplete removal. Too fast: losses. Breakout and flowback are scheduled together |
|
Key QA checks |
Filter-cake removal efficiency, D90, permeability regain |
|
Placement |
After the screens are set |
4.3 Organic-acid precursor system
Formulation. The organic-acid precursor is a reactive carboxylic ester. It releases acid by hydrolysis of the ester bond; retardation is characterised by half-life. The precursor is run with a pre-acid (HCl plus additives, additive loading not less than the main acid loading), a main acid (HCl + HF + additives) and an overflush. Total volume: 10.0× openhole volume = 36.609 m³ per 100 m. Sequence: acidise, shut in for reaction, flow back, place on production.
Acid-rock reaction time on short cores varies with permeability and clay content, between 8 h and 12–14 h.
4.4 Breaker for water-based cake
Water-based cake types include polymer network, carbonate bridging solids, bentonite drilled solids, oil film, lost-circulation material and high-temperature degradation residue. The matching breaker package is enzyme + oxidizer + delayed acid + chelant + solvent + water-wetting surfactant. Total volume: 8.0× openhole volume = 29.287 m³ per 100 m. The sequence is the same: acidise, shut in for reaction, flow back, place on production.
4.5 Retardation mechanism
Mechanism. The primary function of the precursor is to release organic acid slowly by hydrolysis. This minimises losses while the breaker is being placed and delivers uniform cake removal across the openhole. Because the action is slow, the breaker can be spotted and the workstring pulled out of the openhole without fluid loss into the formation.
5 Gravel Pack
The gravel pack retains formation sand, not drilling-fluid solids: it prevents movement of formation sand to the screen and permits use of a normal screen that will not be plugged by the few fines.
Openhole pack (gravel in the screen/openhole annulus): the pack is the filtration medium. Inside-screen pack (gravel inside the screen): filtration, support and stress distribution.
6 Acceptance Criteria
Acceptance is demonstrated by laboratory and field criteria; measured values are given in Table 3.
Table 3 Acceptance criteria and measured results
|
No. |
Criterion |
Measured |
|
4-1 |
Filter-cake removal efficiency, API method |
5% HBK-Lb at 80 °C: 2 h = 95.20 / 96.50%; 4 h = 96.40 / 97.70% |
|
4-2 |
Benchmark under the same conditions |
5% third-party cake remover = 82.60 / 64.20% and 85.50 / 75.50%; 8% KCl = 8.01 / 7.54% and 10.05 / 11.78% |
|
4-3 |
HPHT screen-breakout cell |
5% HBK-Lb at 60 °C: 3 h = 85.6%; 4 h = 90.8% |
|
4-4 |
Core permeability regain |
Static contamination ≥ 97.0%; dynamic ≥ 102.3% |
|
4-5 |
Productivity |
Six wells averaged 12.4% above offset wells |
|
4-6 |
Dispersibility after breakout (D90) |
D90 < 92 μm against a 275 μm slot. Washpipe is not to be pulled until the criterion is met |
|
4-7 |
Breaker type selection |
Acid systems outperform oxidizers: insensitive at high temperature, easier to store and transport, effective on acid-soluble bridging solids. Oxidizers carry higher HSE risk. Enzymes are selective but complex in composition, weaker on cake and fail at high temperature |